What are the advantages of modular constructions?

Advantages


Flexibility

Modular structure design can be easily differentiated according to customer demand. Changes in the interior layout of the building or increase or decrease in the requested area can be easily adapted to the structure.


Time

Exterior factors such as weather conditions or the accessibility of manpower do not have an effect on construction time compared to conventional construction. The production can continue during all time of the year and the project completion date is fixed limiting unforeseen costs securing the investment.


Reduced Mess, Complexity and Time at Construction Site

Production is principally executed in the factory. Onsite work is considerably short and the resulting effect is easy site management and less disturbance for local residents.


Productivity

As modular construction tasks are mostly standardized, downtime costs are low. Virtually no renovation work is required to restore errors in planning, design, or execution. Buildings are delivered importantly earlier, increasing the client's gainfulness.


High Quality Products

The production is executed indoor meaning that the quality and safety is guaranteed and the building materials are protected. Indoor production assures that in every stage of manufacturing process well-defined quality control procedures are performed resulting in a defect free product.

​

12.jpg

Sustainability

Modular production and construction allows handling and using accessible resources and minimizing energy consumption, thus caring for the environment. The modular system design forms significantly less waste since most of the materials can be recycled. Moreover, DMT modular buildings are designed as energy efficient buildings providing a significant reduction of the energy need for heating and cooling.


Production

Modular Construction is both a manufacturing and a construction process, where a building is produced in parts in modules in a factory controlled environment, which then these modules brought together at site to form a complete building, introducing many advantages such as flexibility, shortened project schedules, reduced site costs and increased quality.


Integral Preparation
DMT Modular organize your requirement based on an integrated building plan, covering all applicable specialties. Validated static analysis, proved elaborated solutions, qualified procedure plus fire and thermal protection guarantee that the acceptance procedure takes much less time for your building task.


Industrial Manufacturing
Most of the building is manufactured in the factory area where conditions are supreme for all work. Uninterrupted comprehensive monitoring ensures the top quality. The manufacturing of modules in the plant means no postponement due to bad weather conditions. Corresponding actions assist to shorten construction time, because while the foundations are being excavated on site, the plant has already begun manufacturing your modules.


Effective Logistics
Our skilled logistics experts coordinate the smooth transportation of your modules so that they come to your site "just in time" for the installation of the modules.


Clean, Quiet Assembly
While the final modules are still at the plant, your building is already being installed on site. Assembly workmanship only takes a couple of days, so you can move into your building for the first time after a short time.


Rapid Finishing
Your building still has connections, the facade and the roof to be completed. Thanks to the high prefabrication level, on-site finishing work takes truly short time. Noise and dirt are minimized.


Faster Conclusion
Using dry building elements designates that there is no building moisture within the building, so you can get inside immediately after delivery.

​